• Measuring the terrain

    To get water from the river to where it’s needed – to the livestock and crops – a lot of preparatory work needs to be done.  Measuring the slope  etc. is one of them.  It will be next year before the installation of pumps is actually done.  2014 is the year of preparation and planning.

Leave a Reply